Sadbhuja Das: We have been working on numerous sectors of the ToVP, please see the update on the current works:
1. Utility Floor
We are now raising the land in the utility area and compacting it. The total area measures 130’000 sq feet (12.077 sq M).
In the second image you can also see how the concrete laying has also begun.
2. Inner Walls
You can see the inner walls marble finishing is now going right around. the image attached are of the full area behind the altar.
We practically started the 4 areas, from east to north, west and south.
These areas will be most likely completed within the next 2 months.
3. Pillars
We have also commenced doing the inner pillars in the temple room as specified in our drawings as you saw previously.
We will keep you updated on how they are coming up. This is shaping up very well.
4. Garuda Murti
We are in the final stages of modeling Garuda out of clay and making preparations to make it out of fiberglass, ready for future casting.
5. Iron Work
The iron gate for Prabhupada bridge on the long building is completed and we are going to commence all the ironwork on the Chatris in the coming week.
6. Chatri Peacocks
You can see many of the works on the Chatris are almost completed with the peacocks and marble.
You can see how wonderful the Chatris are shaping up.
Note – The stars and ribbons for the main dome will arrive next week. These are double the size of the ones on the small domes. We are looking forward to working with them.
Find them here: https://goo.gl/SYGhPr