
TOVP: Sadbhuja Das: The second crane has been coming down as you can see in the images.
Now that it has been removed, we are using all types of lifting facilities to bring up the materials and items needed at the top floors.
We have a lift, which it is incredible, used 24hrs a day, and we are even using the rope pulling method.
This will continue on until we install smaller cranes, under the dome level to work on different areas.
Find them here: https://goo.gl/4Ba1Cg
