
TOVP – A Personal Note from Ambarisa Prabhu – Chairman.
Cushman & Wakefield Pujari Floor Report – August 2019.
I am highly pleased and proud to provide the first progress report from our PMC (Project Management Consultancy), Cushman & Wakefield, about the developments of the TOVP Pujari Floor, scheduled for its completion and Grand Opening during Gaura Purnima, 2020. This will be another landmark event for the TOVP as we approach the 2022 Grand Opening of the temple and install our beloved Sri Sri Radha Madhava, Sri Pancha Tattva and Sri Nrsimhadeva Deities, along with the new Srila Prabhupada murti.
This detailed report covers many different important aspects of the pujari floor that ensure the safety, cleanliness, comfort and general smooth service of the Deities, Who are, after all, the main focus of the temple itself. Here is a list of the areas and functions covered in this Report:
Electrical System
Light Management System
Fire Fighting and Security System
Public Address System
CCTV System (closed-circuit television)
Rodent Repellent System
Water Leak Detection System
Aspiration Smoke Detection System
Gas Suppression and Kitchen Hood Suppression System
Pre-action System
HVAC System (air conditioning)
Mechanical Ventilation
PHE Works (Public Health Engineering)
Civil and Interiors
As you can see, this is a huge array of important and necessary aspects of any building, and the scale to which this has all been engineered for maximum efficiency is incredible to say the least. Every dollar of our donors is being spent to install the highest quality and most effective structural elements and components in the world into the TOVP to ensure its longevity and excellence.
While of a very technical nature, we hope all our donors and supporters will enjoy looking through this report and receive further inspiration to continue with their pledge payments and further contributions to complete the TOVP by 2022. Please take this as an impetus to kindly complete your pledges as soon as possible or restart them if you have stopped for some reason to ensure the work can continue on schedule and at the current pace. Thank you very much for your dedication and help.
Ambarisa das
TOVP Chairman
To see more photos: https://is.gd/8vEaDg
Cushman & Wakefield complete report download link: http://bit.ly/2HgWHB9
